New Apartment Handover: A Detailed Snag List Before Acceptance
A possession notice starts an important inspection process; it should not automatically end the buyer's questions.
A possession notice starts an important inspection process; it should not automatically end the buyer's questions. A newly delivered apartment can still require corrections to finishes, fittings, doors, drainage or services. These are commonly called snag items. Buyers should use the approved specifications and the actual agreement to distinguish an unfinished contractual obligation from normal wear or an optional upgrade. A dated, room-by-room list helps both parties understand exactly what remains to be done.
What the difference means in practice
Inspect the home when there is enough light to examine walls and fittings. Test permitted taps, windows, doors and switches with a representative; record damp patches, tiles, slopes and obvious mismatches against the contracted schedule. Check utilities and relevant common-area access too. At the same time, keep the lawful occupation and authority records separate from cosmetic quality. A beautifully finished apartment may still require documentary verification; an approved tower may still have individual defects.
A hypothetical buyer example
Imagine a hypothetical household receiving keys for its first new home. During an organised walkthrough, the buyers find a balcony-door seal problem and an untested utility connection. Rather than rely on a verbal promise that everything will be fixed soon, they photograph the issues with permission, send an agreed snag register and request a correction timetable. They also confirm which payments and acceptance documents should be completed only after the appropriate checks.
Evidence checklist
- Bring the relevant agreement, approved unit specification and actual floor plan to the walkthrough.
- Check finishes, alignment, locks, windows and doors room by room.
- Inspect drainage, visible dampness and accessible plumbing with an authorised representative.
- Test allowed electric points, ventilation and supplied fixtures as appropriate.
- Verify applicable tower occupation documentation and common-area access separately.
- Submit a dated snag register with photographs and written acknowledgement of outstanding work.
Related records to understand
- Possession demand letter: Before accepting a possession demand, verify the applicable OC, exact unit readiness, snag list, agreed charges and delivery conditions. Do not confuse an offer with lawful ready occupancy.
- Structural defects and responsibility: Review the promoter's statutory defect obligations and the agreement, and document defects promptly. A serious structural concern needs an independent engineer, not just a marketing reassurance.
- Water leakage and damp inspection: Look for damp patches, repaired ceiling stains, basement drainage and recent water ingress. A dry-day visit alone may miss seasonal problems; request history and maintenance records.
- Occupation certificate: An Occupation Certificate (OC) is issued by the competent authority under applicable rules after relevant completion/compliance processes. Ask for the OC covering the exact tower or unit before relying on a ready-to-occupy claim.
A careful decision
The aim of a snag list is to make handover clear, not adversarial. Photograph the exact unit, retain correspondence and seek qualified assistance for any structural or safety concern. A buyer can then distinguish minor rectification from matters affecting lawful occupation or the contracted property and avoid treating one type of issue as proof that all the others are resolved.
Sources and verification
Use these official portals to verify relevant current rules and project-specific records.
Educational research compiled from curated information. Not live news, legal advice, a current quotation, a possession promise or an independently verified unit listing.